2025.04.18

Management/Business

Toyo Seikan Begins Using Solar Electricity Produced On-Site at Shizuoka Plant through a Power Purchase Agreement
-Reducing Greenhouse Gas Emissions by Around 810 Tons Annually-

Toyo Seikan Co., Ltd. (“Toyo Seikan”; President: Masanori Honda), a consolidated subsidiary of Toyo Seikan Group Holdings, Ltd. (Tokyo 5901; President: Ichio Otsuka)—in collaboration with TESS Engineering Co., Ltd. (“TESS Engineering”; President: Toshihiro Takasaki) and Mizuho-Toshiba Leasing Company, Limited (“Mizuho-Toshiba Leasing”; President: Shinichiro Maruyama)—has installed an on-site self-consumption solar power generation system at its Shizuoka Plant. Use of renewable electricity began in March 2025 as part of a power purchase agreement (PPA)1.
0
Back to the list